KSM Project – Winter 2023 Bursary Application

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold owns the KSM Project, a proposed gold, copper, silver, and molybdenum mine, located 65 north of Stewart, BC. The KSM Project will employ approximately 1,800 people during its 5-year construction and approximately 1,040 jobs during its 52-year mine life. While construction has not yet started on the KSM Project, Seabridge Gold supports building […]

Seabridge Gold 2022 Newsletter

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

At Seabridge Gold, we are committed to early, frequent, and transparent communication with local communities and our Indigenous Partners where we operate by sharing regular updates about the company and our Projects.  This year’s newsletter, that was sent to 13,000+ residents of northwest BC, features a message from Ryan Hoel, Seabridge Gold’s newly appointed Chief Operating Officer and […]

Job Openings: Senior Environment Superintendent & Environment Superintendent

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Our Integrated KSM Project Team at Fluor are seeking 2 new positions to advance the KSM Project. Seabridge Gold was founded in 1999 and holds a 100% interest in several North American gold projects. Seabridge’s assets include the KSM and Iskut projects located near Stewart, BC, the Courageous Lake project located in the Northwest Territories, […]

KSM Project – Fall 2022 Bursary Application

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold owns the KSM Project, a proposed gold, copper, silver, and molybdenum mine, located 65 north of Stewart, BC. The KSM Project will employ approximately 1,800 people during its 5-year construction and approximately 1,040 jobs during its 52-year mine life. While construction has not yet started on the KSM Project, Seabridge Gold supports building […]

Job Opening: GIS/CAD Technician

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold Inc. is seeking a full-time GIS/CAD Technician, for the Kerr Sulphurerts and Mitchel (KSM) project, particularly the front-end Substantial Start phase. Read the job description here. Location – Remote – Home based with some travel to Seabridge offices and project sites as required. Closing Date: June 26, 2022 We are pleased to consider all qualified applicants for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, protected veterans’ status, Indigenous status, or any other legally protected factors. Please apply through email to hr@seabridgegold.com and attach your Cover Letter and Resume in Word or PDF format. Thank you for your application; however, only those selected for an interview will be contacted.

Job Opening: Administrative Assistant

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold Inc. is seeking a full-time Administrative Assistant Read the job description here. Location – Terrace, BC Closing Date: June 22, 2022 We are pleased to consider all qualified applicants for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, protected veterans’ status, Indigenous status, or any other legally protected factors.  […]

Seabridge Gold Virtual Open House 2022

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold held a virtual open house on May 24, 2022. Hear from our management team (Jay Layman, Director, President, and Chief Operating Officer; Elizabeth Miller, Vice President, Environment and Social Responsibility (ESR); and Ryan Hoel, Vice President, Projects) about the latest updates and the benefits of the KSM Project, located 65km northwest of Stewart, […]

Update on the Installation of the Bell-Irving Bridge and Navigation Closure

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

KSM Mining ULC is providing notice that the installation of the permanent bridge girders may limit and/or close the public access to navigation of the Bell-Irving River for safety reasons. The work will be conducted intermittently between June 2- 15, 2022. Any closures to navigation, where required, will not occur until after June 5. Efforts will be made […]

Job Opening: Site Manager

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold Inc. is seeking a full-time Site Manager Read the job description here. Location – KSM Project Site, BC 2×2 rotation Closing Date: April 6, 2022 We are pleased to consider all qualified applicants for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, protected veterans’ status, Indigenous status, or any […]

Job Opening: Community Relations Administrative Assistant

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold Inc. is seeking a full-time Community Relations Administrative Assistant.  Read the job description here. Location – This position is based out of our Smithers, BC office.   Travel to local communities and events as required. Closing Date: March 24, 2022 We are pleased to consider all qualified applicants for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national […]

Search