Update on the Installation of the Bell-Irving Bridge and Navigation Closure
![KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance](https://ksmproject.com/wp-content/uploads/2022/11/KSM-KERR-SULPHURETS-MITCHELL-A-Responsibly-Designed-Gold-Copper-Project-with-Regulatory-and-Social-Acceptance-1024x576.png)
KSM Mining ULC is providing notice that the installation of the permanent bridge girders may limit and/or close the public access to navigation of the Bell-Irving River for safety reasons. The work will be conducted intermittently between June 2- 15, 2022. Any closures to navigation, where required, will not occur until after June 5. Efforts will be made […]