Job Opening: GIS/CAD Technician

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold Inc. is seeking a full-time GIS/CAD Technician, for the Kerr Sulphurerts and Mitchel (KSM) project, particularly the front-end Substantial Start phase. Read the job description here. Location – Remote – Home based with some travel to Seabridge offices and project sites as required. Closing Date: June 26, 2022 We are pleased to consider all qualified applicants for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, protected veterans’ status, Indigenous status, or any other legally protected factors. Please apply through email to hr@seabridgegold.com and attach your Cover Letter and Resume in Word or PDF format. Thank you for your application; however, only those selected for an interview will be contacted.

Job Opening: Administrative Assistant

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold Inc. is seeking a full-time Administrative Assistant Read the job description here. Location – Terrace, BC Closing Date: June 22, 2022 We are pleased to consider all qualified applicants for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, protected veterans’ status, Indigenous status, or any other legally protected factors.  […]

Seabridge Gold Virtual Open House 2022

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

Seabridge Gold held a virtual open house on May 24, 2022. Hear from our management team (Jay Layman, Director, President, and Chief Operating Officer; Elizabeth Miller, Vice President, Environment and Social Responsibility (ESR); and Ryan Hoel, Vice President, Projects) about the latest updates and the benefits of the KSM Project, located 65km northwest of Stewart, […]

Update on the Installation of the Bell-Irving Bridge and Navigation Closure

KSM (KERR-SULPHURETS-MITCHELL) - A Responsibly Designed Gold-Copper Project with Regulatory and Social Acceptance

KSM Mining ULC is providing notice that the installation of the permanent bridge girders may limit and/or close the public access to navigation of the Bell-Irving River for safety reasons. The work will be conducted intermittently between June 2- 15, 2022. Any closures to navigation, where required, will not occur until after June 5. Efforts will be made […]

Search